North Texas Commercial Cleaning Experts | Call (214)-586-0257
Print to PDF
Document IDHWB-QMS-STRAT-002
Version2.0.0
Statusâ—Ź APPROVED
Clause7.5
Document Control
Document Title S4/IEE Project Execution Roadmap (DMAIC)
Document ID HWB-QMS-STRAT-002
Version 2.0.0
Status APPROVED
Author George (Systems Architect)
Date 09/21/2026

SigmaFidelity™ DMAIC Execution Roadmap

1.0 Purpose

This document defines the rigorous S4/IEE execution path for SigmaFidelity™ projects. It ensures that every facility management intervention follows a standardized process to eliminate waste and protect human capital.

2.0 DMAIC Execution Chart

graph TD subgraph DEFINE [DEFINE] D1[Identify Strategic Leakage] --> D2[Map IEE Value Chain] D2 --> D3[Establish Project Charter] end subgraph MEASURE [MEASURE] M1[Collect Gemba Data] --> M2[Calculate COPQ/CODND] M2 --> M3[Baseline 30,000-Foot Performance] end subgraph ANALYZE [ANALYZE] A1[Identify 8th Waste: Unused Talent] --> A2[Verify Root Cause: Telephone Game] A2 --> A3[Quantify Turnover Liability] end subgraph IMPROVE [IMPROVE] I1[Deploy SigmaFidelity™ Standard] --> I2[Restore Professional Boundaries] I2 --> I3[Automate Information Fidelity] end subgraph CONTROL [CONTROL] C1[Monitor KPOV/KPIV Dashboard] --> C2[Execute Daily SIPOC Updates] C2 --> C3[Finalize ISO 9001 Audit Readiness] end %% Flow Connections DEFINE --> MEASURE MEASURE --> ANALYZE ANALYZE --> IMPROVE IMPROVE --> CONTROL CONTROL --> DEFINE %% Styling style DEFINE fill:#e1f5fe,stroke:#01579b style MEASURE fill:#fff3e0,stroke:#e65100 style ANALYZE fill:#f1f8e9,stroke:#33691e style IMPROVE fill:#f3e5f5,stroke:#4a148c style CONTROL fill:#fce4ec,stroke:#880e4f

3.0 Phase Deliverables

  • Define: Signed Charter, SIPOC Map, and Stakeholder Analysis.
  • Measure: Current State Data, "Waste of Talent" baseline.
  • Analyze: Root Cause Matrix (The 5 Whys of the Cargo Cult).
  • Improve: Deployed Cleaning Crew, Updated Site SOPs.
  • Control: Live Dashboards, Verified Asset Map, Quarterly QMS Reviews.

4.0 Revision History

Version Date Author Description
1.0 2026-02-21 Gemini Initial S4/IEE Roadmap Release.
2.0.0 09/21/2026 George (Systems Architect) Modernized and upgraded to post-May 1st, 2026 baseline. Standardized under HWB-QMS-1.0 v2.0 (Everyday Words) and approved by Humberto Dominguez, CEO.
Document Structure